Home Additions — Room Additions, Second Stories & ADUs
From a single room bump-out to a full second-story addition or detached ADU, our team manages the entire process: architecture, structural engineering, permitting, and construction. We match existing rooflines, siding, and trim so the addition reads as part of the original home.
What's included
- Architectural design & 3D modeling
- Structural engineering & foundations
- Permits, zoning & variance support
- Roof tie-ins & exterior matching
- Mechanical, electrical & plumbing
- Detached ADUs (granny flats)
- Second-story additions
- Garage conversions
How the project runs
- Feasibility: Setbacks, lot coverage, and structural feasibility checked before design begins.
- Design & Permit: Stamped drawings, energy calcs, and permit submission with the local jurisdiction.
- Build: Foundation, framing, dry-in, MEP, finishes — sequenced to keep the existing home livable.
- Final Walk: Final inspections, certificate of occupancy, and warranty handoff.
Frequently asked questions
- How long does a home addition take? Design and permitting typically take 2–4 months; construction runs 4–9 months depending on size and complexity.
- Can you match my existing siding and roof? Yes. We source matching materials wherever possible, and where unavailable, we propose a complementary detail that reads as intentional.
- Do you build ADUs? Yes — both attached and detached accessory dwelling units, including full kitchens, bathrooms, and separate utility metering when required.
FlexToFit Construction — licensed & insured general contractor. Call +1 (716) 575-3539 or email info@flextofit.com.